Steel Column Slab Wall Formwork for Concrete Construction

Product Details
Customization: Available
Material: Steel
Type: Column Formwork
Diamond Member Since 2017

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Management System Certification
ISO 9001, SHE Audits
Export Year
2008-08-08
OEM/ODM Availability
Yes
  • Steel Column Slab Wall Formwork for Concrete Construction
  • Steel Column Slab Wall Formwork for Concrete Construction
  • Steel Column Slab Wall Formwork for Concrete Construction
  • Steel Column Slab Wall Formwork for Concrete Construction
  • Steel Column Slab Wall Formwork for Concrete Construction
  • Steel Column Slab Wall Formwork for Concrete Construction
Find Similar Products

Basic Info.

Model NO.
SLM-F
Color
Red or Customized
Fresh Concrete Pressure
Above 60kn/Sqm
Usage Time
Above 200 Times
Weight
Around 90kg/Sqm
Sizes and Shapes
Customized
Transport Package
Standard Export Package
Specification
Customized
Trademark
SHLM
Origin
China
HS Code
73084000

Product Description


PRODUCT DESCRIPTION

Steel Column Slab Wall Formwork for Concrete Construction
Fromwrok system

Steel Formwork is the most conventional formwork of different kinds of steel material, it is not only used in metros, bridge piers, tunnels, but also other irregular shape of concrete structures.

Feature

* Customized panel size and shapes are available;
* Ready to use pre-assembly;
* Can be cast into any size and shape according to different project structure;
* Well compatible with other formwork components.

Application

Irregular bridge piers, shaft core walls, residencial & commercial buildings, basement, bridge piers, columns ect..


Technical Specification

* Width: 0.3m/0.45m/0.6m/0.9m/1.2m/1.5m/1.8m/2.1m;
* Height:2.7m/3.0m;
* Or any customizes unit sizes according to structural drawings

 
  
Steel Column Slab Wall Formwork for Concrete Construction
Steel Column Slab Wall Formwork for Concrete Construction
 

PACKING&DELIVERY

1. Production: For full container, normally we need 20-30 days after receive customer's down payment.
2. Transportation: It depends on the destination charge port.
3. Negotiation is needed for special requirements.

 

Steel Column Slab Wall Formwork for Concrete Construction
Steel Column Slab Wall Formwork for Concrete Construction
Steel Column Slab Wall Formwork for Concrete Construction

 

Shandong Shlomi Machinery Co., Ltd. is a professional supplier since year 2008 which produce the steel fromwork wall formworkslab formworkcolumn formwork, climbing formwork, slip formwork ,Scaffolding Accessories, Formwork accessories,Shoring Prop and so on ,We have a strong and highly efficient R&D team which can design and make OEM/ODM products according to your ideas and samples or drawings.
We insist on the "superior Quality, Competitive Price" to reach win-win situation with our customers. our main customers come from Europe, the Middle East, Australia, America and the South Africa..                                  

Important Instructions:

• Once erection is finished, double-check the props before use.
• Respect the prop spacing in accordance with the project.
• Prop load capacities and engineer's design must be observed.
• The load acting on the prop is vertical and centred. No horizontal loads act on the prop.
• Check formwork and prop erection before concrete pouring.
• Pouring has to be done from heights which do not cause strong shaking of the formwork or the props.
• Avoid the sudden emptying of the concrete bucket onto the formwork.
• Formwork stripping and prop removal is only carried out when the concrete strength is sufficiently high.
• Before starting any dismantling operation, check the state of the props.
• After removal, props should not be irregularly piled up.

Packing:
1. Generally, the total net weight of loaded container is 22 tons to 26 tons, which need be confirmed before loading.
2. Different packages are used for different products: 
---bundles: timber beam, steel props, tie rod, etc.
---pallet: small parts will be put in bags and then on pallets.
---wooden cases: it is available on customer's request.
---bulk: some irregular goods will be loaded in bulk in container.

Delivery:
1. Production: For full container, normally we need 20-30 days after receive customer's down payment.
2. Transportation: It depends on the destination charge port.
3. Negotiation is needed for special requirements. 

Why us: 
With 12 years of experience, we know exactly what you need; 
Strict quality control in raw material selection, production line, and pre-packing, which ensures the reliable product quality as per customer's request. 
Prompt action on customer's requirments. 
Shandong Shlomi Machinery Co., Ltd. welcome friends all over the world !


Steel Column Slab Wall Formwork for Concrete Construction
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier